Legal and Regulatory Documents
Document Library and Interconnection Resources
Browse through reports, proposals, interconnection documents and more.
Reference Documents
- Banner Attachment Guidelines + Policies
- Choosing Underground Electric Service for Your Community
- Climate Change Vulnerability Study
- Comprehensive and Regular Management and Operations Audit of LIPA and PSEG Long Island | DPS Letter
- Contract Report from the Long Island Power Authority and PSEG Long Island LLC
- Efficiency and Renewable Evaluation Reports
- LIPA Local Transmission Plan
- LIPA Contracts and Reports
- LIPA Flow Down Provisions for Contracts Entered into by PSEG Long Island
- LIPA Substation Design Criteria
- PSEG Long Island Emergency Restoration Plan
Utility 2.0 Long Range Plan & Energy Efficiency and Demand Response
- 2024 Annual Update Video Presentation | PDF Presentation | Filing
- 2023 Annual Update Video Presentation | PDF Presentation | Filing
- 2022 Annual Update and Public Information Session
- 2022 Annual Update
- 2021 Annual Update
Interconnection Resources
- Bulk Electric System Facility and End User Interconnection Requirements to the LIPA Transmission System - May 2024
- Revenue Metering Requirements for Generating Facilities Interconnecting to the LIPA System
- NYISO Transmission Expansion and Interconnection Manual
- Requirements For Generating Facility Interconnection To The LIPA Transmission System - April 2024
- Statement for Performance Requirements for Transmission Connected Resources Using Non-Synchronous Generation
- Non-SynchronousGeneration - HVDC - FACTs Interconnection Projects - Power System Studies for Considerations
- Transmission Planning Criteria