Reference Documents
SGIP Reference Documents
Please browse through the reference documents below.
Small Generator Interconnection Procedures
- Appendix A: Standardized Contract for Systems 5 MW or Less
- Appendix B: Standardized Application for Inverter Based System
- Appendix C: Standardized Application for Non-Inverter Based Systems
- Appendix D: Pre-Application Report
- Appendix F: Application Checklist
- Appendix H: Property Owner Consent Form
- Appendix H1 - Site Control Certification
- Appendix I: Moratorium Attestation Form
- Appendix J: Energy Storage System (Ess) Application Requirements
- Appendix L: Small Generator Certificate of Completion
- Appendix M: Interconnection Agreement for a System Greater Than 5 MW + Less Than 10 MW
- Appendix P1: Feasibility Study Agreement
- Appendix P2: Assumptions Used In Conducting System Feasibility Study
- Appendix Q1: System Impact Study
- Appendix Q2: Assumptions Used In Conducting the System Impact Study
- Appendix R1: Facilities Study Agreement
- Appendix R2: Facilities Study Agreement Input Data Requirements
- Contractor Self Certification Form for Inverter based Systems 25 kW or less
- Remote Net Metering Application
- SG SGIP Fee Schedule
- Direct Transfer Trip (DTT) Specifications for DER Interconnections
- PSEG Long Island Telecommunications Requirements for Supervisory Control Access and Data Acquisition (SCADA) Network
Examples of Required Documents
- Example Diagrams for DER
- DER Interconnection Protection System Test Report
- FIT Certificate of Insurance
- Typical Letter of Authorization
- Manufacturer’s data sheet for the equipment(s)
- Equipment (s) certification to UL 1741 (Current revision)
- Site Control Doc-Identify Right to Develop Site
- Sample Certificate of Completion
- Sample Self Certification Form