Direct Current Fast Charging
PSEG Long Island DCFC Incentive Program
PSEG Long Island’s Direct Current Fast Charger (DCFC) Incentive program offers operating cost relief in the form of incentives for the demand charges found on the electric bill. Qualified customers can receive up to 50% of their demand charges in the form of a rebate check 12 months after their anniversary date.
Available Incentives
All new applicants are eligible for the 50% demand charge relief incentive. The EV Team would determine what their demand charges were over a 1-year period and issue a check for 50% of their cumulative demand charges.
DCFC Incentive Program Example | |||
Anniversary Date | Actual Demand Charges | DCR | Eligible Incentive |
01/01/2024 - 12/31/2024 | $110,050 | 50% | $55,025 |
12/30/2024 - 12/31/2025 | $121,245 | 50% | $60,622.50 |
This program will not accept any new applications after December 31, 2024. Furthermore, this program will conclude in 2025. A new commercial tariff (EV Phase-In Rate) will be made available for all electric vehicle charging stations and fleets in the latter half of 2025.
Application
The DCFC Incentive program offers operating cost relief in the form of incentives for the demand charges found on the electric bill. Please email completed form and required documentation to PSEG-LIDCFC@pseg.com.
-
- DCFC station must have public accessibility for the general public
- DC Fast Charger output must be 50 kW or greater
- Utilize connector types CCS or ChAdeMO
- North American Charging Standard (NACS) connectors may be utilized so long as at least one (1) CCS or ChAdeMO connector type is made available at the location
-
Email the completed application form with all of the following documentation to PSEG-LIDCFC@pseg.com.
- Copy of Charge Letter associated with project (also referred to as Contribution In Aid of Construction [CIAC])
- Copy of PSEG Long Island electric bill
- W-9
-
Participants will be required to submit data every 12 months, using the DCFC Incentive Program Data Requirements Template (Under Program Resources), prior to receiving payment and provide the following information:
Applicant Information
- Contact Name
- Contact Title
- Company Name
- City: State: ZIP Code
- Telephone
- Location
- Reporting Entity
- Unique Data Source ID
- Unique Session ID
- Port ID
- Timestamp: Plug In and Plug Out
- Timestamp: Charging Start and Charging End
- Time Zone
- Charging Duration (min)
- Energy Delivered (kWh)
- Peak Power (kW)
- Amount Charged ($)
- Technologies used to manage demand