Town of Southampton
Completed Projects
Southampton to Deerfield Transmission Project
PSEG Long Island, as the agent of LIPA, is proposing a new underground electric transmission project to increase the load capacity and reliability of the electric transmission system on Long Island. Called the Southampton to Deerfield Transmission Project ("SHDF Project" or "Project"), its principal component is the installation of a new underground 138 kilovolt (kV) transmission line between the existing Southampton Substation (located in the Village of Southampton at the intersection of North Sea Road and West Prospect Street) and the existing Deerfield Substation (located in the Hamlet of Watermill on Water Mill Towd Road) primarily along roadways and existing municipal rights-of-way. The SHDF Project is the most cost-effective solution to meet the South Fork's increasing electrical demand and need for reliable electrical service while minimizing disruptions to the community.
Westhampton Beach and the Village of Westhampton Dunes
Start Date: February 2022
Posted date: February 16, 2022
The route will cover approximately 2.89 miles along an electric main line circuit. Crews will be working on the following streets:
Dune Road between Cove Lane and Jessup Lane
Hamlet of Noyack
Start Date: March 2022
Posted date: February 16, 2022
The route will cover approximately .85 miles along an electric main line circuit. Crews will be working on the following streets:
Long Beach Road between Noyack Road and Harbor Drive.
Noyack and the Village of Sag Harbor in the Towns of Southampton and East Hampton
Start Date: November 2018
Posted Date: October 23, 2018
The route will cover approximately 6 miles along an electric main line circuit. PSEG Long Island crews will be working on the following streets:
Noyac Road between Bay Avenue and Brick Kiln Road
Stony Hill Road between Noyac Road and Rosewood Drive
Hildreth Street between Noyac Road and Bridgehampton-Sag Harbor Turnpike
Bridgehampton-Sag Harbor Turnpike between Hildreth Street and Scuttle Hole Road
Brick Kiln Road between Noyac Road and Main Street
Jermain Avenue between Main Street and Division Street
Division Street between Jermain Avenue and Hampton Street
Elizabeth Street between Division Street and Atlantic Avenue
Atlantic Avenue between Elizabeth Street and Clinton Street
Clinton Street between Atlantic Avenue and Hampton Street
Hampton Street between Clinton Street and Eastville Avenue
Eastville Avenue between Hampton Street and Hempstead Street
Oakland Avenue between Jermain Avenue and Main Street
Palmer Terrace between Jermain Avenue and Main Street
Main Street between Palmer Terrace and Garden Street
Garden Street between Main Street and Spring Street
Spring Street between Garden Street and Main Street
Bridge Street between Spring Street and West Water Street
Rose Street between Bridge Street and Meadow Street
In addition, switching equipment will be replaced at Noyac Road west of Brick Kiln Road and Brick Kiln Road west of Main Street.
Tuckahoe and the Village of Southampton
Start Date: October 2018
Posted Date: October 23, 2018
PSEG Long Island crews will be working on the following streets:
Halsey Neck Lane between Meadow Lane and Boyeson Road
Boyeson Road between Halsey Neck Lane and Captains Neck Lane
Captains Neck Lane between Boyeson Road and Hill Street
Hill Street between Montauk Highway and Halsey Street
Montauk Highway between Hill Street and Osceola Lane
Tuckahoe Lane between Montauk Highway and North Highway (Route 27)
Halsey Street between Hill Street and West Prospect Street
West Prospect Street between Halsey Street and North Sea Road
In addition, switching equipment will be installed at Tuckahoe Lane south of North Highway (Route 27), Montauk Highway west of Tuckahoe Lane, Hill Street west of Lee Avenue and Captains Neck Lane south of Hill Street.
Village of Southampton
Start Date: November 2018
Posted date: October 23, 2018
The route will cover approximately 3 miles along an electric main line circuit. PSEG Long Island crews will be working on the following streets:
Prospect Street between North Main Street and North Sea Road
West Prospect Street between South Street and North Sea Road
North Sea Road between Prospect Street and Windmill Lane
Windmill Lane between North Sea Road and Hill Street
Culver Street between First Neck Lane and Pond Lane
Pond Lane between Culver Street and Hill Street
Hill Street between Windmill Lane and Jobs Lane
Jobs Lane between Hill Street and South Main Street
Meeting House Lane between South Main Street and dead end
Little Plains Road between Meeting House Lane and Gin Lane
Herrick Road between Little Plains Road and Old Town Road
Nugent Street (Route 27A) between Windmill Lane and Main Street
Hampton Road (Route 27A) between Main Street and Little Plains Road
In addition, switching equipment will be replaced at Hampton Road (Route 27A) east of Elm Street and Meetinghouse Lane east of Little Plains Road
Village of Southampton
Start Date: September 2019
Posted date: October 1, 2019
The route will cover approximately 1,300 feet along an electric main line circuit. PSEG Long Island crews will be working on the following streets:
Hampton Road between Main Street and Little Plains Road