Transmission Owner Temporary Limitation
Date | Time | Post |
---|---|---|
11/20/2024 | 08:55:00 AM | Implementation table for East End Generation Start Procedure Row 1, which assumes East Hampton DVAR available, Canal DRSS DVAR 100% and Canal DRSS Caps Available is now in effect until further notice. |
10/05/2024 | 18:06:00 PM | Northport Exit Limitation end time of 10/05/2024 18:06:00 |
10/03/2024 | 1:22:00 PM | Northport Exit Limitation The combined output of Northport 1 and 2 is limited to approximately 250 MWN. Estimated start Time of 10/05/2024 00:01:00 and estimated end time of 10/05/2024 23:59:00. |
10/02/2024 | 20:18:00 PM | Northport Exit Limitation end time of 10/02/2024 19:14:00 |
09/30/2024 | 3:10:00 PM | Northport Exit Limitation The combined output of Northport 1 and 2 is limited to approximately 250 MWN. Estimated start Time of 10/02/2024 00:01:00 and estimated end time of 10/02/2024 23:59:00. |
09/25/2024 | 19:15:00 PM | Northport Exit Limitation end time of 09/25/2024 19:15:00 |
09/23/2024 | 11:45:00 AM | Northport Exit Limitation The combined output of Northport 1 and 2 is limited to approximately 250 MWN. Estimated start Time of 09/25/2024 00:01:00 and estimated end time of 09/25/2024 23:59:00 . The limitation posted for 09/24/2024 previously made on 09/20/2024 at 03:22 PM is revoked. |
9/20/2024 | 3:22:00 PM | Northport Exit Limitation The combined output of Northport 1 and 2 is limited to approximately 250 MWN. Estimated start Time of 09/24/2024 00:01:00 and estimated end time of 09/24/2024 23:59:00 |
8/1/2024 | 2:00:13 PM | Implementation table for East End Generation Start Procedure Row 2, which assumes East Hampton DVAR available, Canal DRSS DVAR 75% and Canal DRSS Caps Available is now in effect until further notice. Estimated start time 8/1/2024 14:00:00 and estimated end time 12/31/2024 23:59:00. |
8/1/2024 | 7:17:09 AM | Implementation table for East End Generation Start Procedure Row 7, which assumes East Hampton DVAR available, Canal DRSS DVAR 75% and Canal DRSS Caps Out of Service is now in effect until further notice. Estimated start time 8/1/2024 7:00:00 AM and estimated end time 8/1/2024 12:00:00 PM. |
7/8/2024 | 1:41:00 AM | Northport Exit Limitation The combined output limitation for Northport 3 and 4 is no longer in effect. Estimated start Time of 7/8/2024 1:41:00 and estimated end time of 12/31/2024 23:59:00 |
7/5/2024 | 8:38:00 AM | Implementation table for East End Generation Start Procedure Row 2, which assumes East Hampton DVAR available, Canal DRSS DVAR 75% and Canal DRSS Caps Available is now in effect until further notice. |
7/4/2024 | 8:17:15 PM | Implementation table for East End Generation Start Procedure Row 12, which assumes East Hampton DVAR Out of Service, Canal DRSS DVAR 75% and Canal DRSS Caps Available is now in effect until further notice. Estimated start time of 7/4/2024 20:00:00 and estimated end time of 7/5/2024 23:59:00. |
07/03/2024 | 11:23:00 AM | Northport Exit Limitation The combined output of Northport 3 and 4 is limited to approximately 500MWN. Estimated start Time of 06/27/2024 19:00:00 and estimated end time of 07/08/2024 23:59:00 |
06/25/2024 | 03:17:00 PM | Northport Exit Limitation The combined output of Northport 3 and 4 is limited to approximately 500MWN. Estimated start Time of 06/27/2024 19:00:00 and estimated end time of 07/05/2024 23:59:00 |
6/19/2024 | 6:30:00 AM | Northport Exit Limitation The combined output limitation for Northport 3 and 4 is no longer in effect. Estimated start Time of 06/19/2024 02:00:00 and estimated end time of 12/31/2024 23:59:00 |
06/14/2024 | 12:19:48 PM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 06/14/2024 12:19:48 and estimated end time of 12/31/2024 23:59:00 |
06/11/2024 | 04:20:00 PM | Northport Exit Limitation The combined output of Northport 3 and 4 is limited to approximately 500MWN. Estimated start Time of 06/11/2024 16:20:00 and estimated end time of 06/21/2024 23:59:00 |
6/10/2024 | 08:30:00 AM | Implementation Tables for G.3 Table 2, which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 06/10/2024 09:00:00 and estimated end time of 06/14/2024 23:59:00 |
6/6/2024 | 16:50:00 PM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 6/6/2024 16:50:00 PM and estimated end time of 12/31/2024 23:59:00 |
06/03/2024 | 8:00:00 AM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 6/3/2024 08:00:00 and estimated end time of 06/07/2024 23:59:00 |
05/21/2024 | 10:43:00 AM | Implementation table for East End Generation Start Procedure Row 2, which assumes East Hampton DVAR available, Canal DRSS DVAR 75% and Canal DRSS Caps Available is now in effect until further notice. |
05/20/2024 | 13:31:00 PM | Implementation table for East End Generation Start Procedure Row 12, which assumes East Hampton DVAR Out of Service, Canal DRSS DVAR 75% and Canal DRSS Caps Available is now in effect until further notice. |
05/19/2024 | 17:00:00 PM | Far Rockaway Generation Far Rockaway generation may be needed due to transmission related work Estimated start Time of 05/19/2024 18:00:00 and estimated end time of 05/20/2024 23:59:00 |
2/28/2024 | 12:14:26 PM | Implementation table for East End Generation Start Procedure Row 2, which assumes East Hampton DVAR available, Canal DRSS DVAR 75% and Canal DRSS Caps Available is now in effect until further notice. |
2/27/2024 | 20:34:57 PM | Implementation table for East End Generation Start Procedure Row 12, which assumes East Hampton DVAR Out of Service, Canal DRSS DVAR 75% and Canal DRSS Caps Available is now in effect until further notice. |
1/24/2024 | 17:12:00 PM | Far Rockaway Generation Far Rockaway generation may be needed due to transmission related work Estimated start Time of 01/24/2024 18:00:00 and estimated end time of 01/30/2024 23:59:00 |
1/5/2024 | 00:58:12 AM | Implementation table for East End Generation Start Procedure Row 2, which assumes East Hampton DVAR available, Canal DRSS DVAR 75% and Canal DRSS Caps Available is now in effect until further notice. |
1/3/2024 | 2:17:17 PM | Implementation table for East End Generation Start Procedure Row 10, which assumes East Hampton DVAR available, Canal DRSS DVAR 0% and Canal DRSS Caps Out of Service is now in effect. Estimated start Time of 01/04/2024 00:00:00 and estimated end Time of 01/04/2024 21:00:00 |
12/08/2023 | 2:15:00 PM | Grumman Exit Limit
The combined exit limit of Calpine Bethpage 1,2,3 and 4 is no longer in effect as of 12/08/2023 14:15:00 |
12/04/23 | 11:34:00 AM |
Grumman Exit Limit The combined exit limit of Calpine Bethpage 1,2,3 and 4 is 94 MWs due to a temporary transmission limitation. |
11/30/2023 | 6:47:13 PM | Implementation table for East End Generation Start Procedure Row 2, which assumes East Hampton DVAR available, Canal DRSS DVAR 75% and Canal DRSS Caps Available is now in effect until further notice. |
11/26/2023 |
10:00:00 AM |
Implementation table for East End Generation Start Procedure |
11/8/2023 | 9:21:21 AM | Implementation table for East End Generation Start Procedure Row 2, which assumes East Hampton DVAR available, Canal DRSS DVAR 75% and Canal DRSS Caps Available is now in effect until further notice. |
8/21/2023 | 21:42:50 PM | Grumman Exit Limit
The combined exit limit of Calpine Bethpage 1,2,3 and 4 is no longer in effect as of 8/21/2023 19:59:16 PM. |
08/19/2023 | 15:03:25 PM |
Grumman Exit Limit The combined exit limit of Calpine Bethpage 1,2,3 and 4 is 72 MWs due to a temporary transmission limitation. |
06/21/2023 | 18:24:57 PM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 06/21/2023 18:24:57 and estimated end time of 12/31/2023 23:59:00 |
06/16/2023 | 20:23:23 PM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 06162/2023 20:23:23 and estimated end time of 12/31/2023 23:59:00 |
06/14/2023 | 23:51:58 PM | Implementation Tables for G.3 Table 1 which assumes BOTH West Bus DRSS and Wildwood DRSS Out of Service is effective until further notice Estimated start Time of 06/14/2023 23:51:58 and estimated end time of 12/31/2023 23:59:00 |
06/14/2023 | 00:27:00 AM |
Implementation Tables for G.3 Estimated start Time of 06/14/2023 00:27:00 and estimated end time of 12/31/2023 23:59:00 |
06/09/2023 | 12:52:44 PM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 06/09/2023 12:52:44 and estimated end time of 12/31/2023 23:59:00 |
06/02/2023 | 12:44:53 PM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 06/02/2023 12:44:53 and estimated end time of 12/31/2023 23:59:00 |
05/23/2023 | 10:06:00 AM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 05/23/2023 10:06:00 and estimated end time of 12/31/2023 23:59:00 |
05/23/2023 |
07:13:41 AM |
Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 05/23/2023 07:13:41 and estimated end time of 12/31/2023 23:59:00 |
05/11/2023 |
11:58:00 AM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 05/11/2023 11:58:00 and estimated end time of 12/31/2023 23:59:00 |
05/08/2023 |
12:20:14 AM |
Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 05/08/2023 00:18:00 and estimated end time of 12/31/2023 23:59:00 |
05/05/2023 | 17:45:25 PM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 05/05/2023 17:45:25 and estimated end time of 12/31/2023 23:59:00 |
05/01/2023 | 05:31:25 PM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 05/01/2023 05:31:25 and estimated end time of 05/05/2023 17:45:25 |
04/27/2023 | 19:27:00 PM |
Northport Exit Limitation |
03/24/2023 | 20:32:10 PM |
Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 03/24/2023 20:32:10 and estimated end time of 12/31/2023 23:59:00 |
03/24/2023 | 17:38:10 PM |
Implementation Tables for G.3 |
02/13/2023 | 04:36:00 PM | Northport Exit Limitation The combined output of Northport 3 and 4 is limited to approximately 480MWN. Estimated start Time of 12/05/2022 09:00:00 and estimated end time of 05/15/2023 23:59:00 |
02/02/2023 | 02:44:00 PM | **This is a test** |
01/06/2023 | 10:58:00 AM | Northport Exit Limitation The combined output of Northport 3 and 4 is limited to approximately 480MWN. Estimated start Time of 12/05/2022 09:00:00 and estimated end time of 02/15/2023 23:59:00 |
12/19/2022 | 09:21:00 AM | Northport Exit Limitation The combined output of Northport 3 and 4 is limited to approximately 480MWN. Estimated start Time of 12/05/2022 09:00:00 and estimated end time of 01/15/2023 23:59:00 |
12/05/2022 | 09:00:00 PM | Northport Exit Limitation The combined output of Northport 3 and 4 is limited to approximately 480MWN. Estimated start Time of 12/05/2022 09:00:00 and estimated end time of 12/31/2022 23:59:00 |
11/21/2022 | 03:33:00 PM | Northport Exit Limitation The combined output of Northport 3 and 4 is no longer limited at this time. Estimated start Time of 07/18/2022 10:45:00 and estimated end time of 11/21/2022 15:33:00 |
09/02/2022 | 09:15:00 AM | Northport Exit Limitation The combined output of Northport 3 and 4 is limited to approximately 470MWN between 1000 and 2200 hours and 550MWN between 2200 and 1000 hours. Estimated start Time of 07/18/2022 10:45:00 and estimated end time of 12/31/2022 23:59:00 |
08/01/2022 | 12:17:00 PM | Implementation table for East End Generation Start Procedure Row 1, which assumes East Hampton DVAR available, Canal DRSS DVAR 100% and Canal DRSS Caps Available is now in effect until further notice. |
07/22/2022 | 13:45:00 | Implementation table for East End Generation Start Procedure Row 2, which assumes East Hampton DVAR available, Canal DRSS DVAR 75% and Canal DRSS Caps Available is now in effect until further notice. |
07/19/2022 | 20:37:00 |
Neptune Limitation |
07/19/2022 | 08:10:00 AM | Northport Exit Limitation The combined output of Northport 3 and 4 is limited to approximately 470MWN between 1000 and 2200 hours and 550MWN between 2200 and 1000 hours. Estimated start Time of 07/18/2022 10:45:00 and estimated end time of 09/16/2022 23:59:00 |
07/18/2022 | 10:45:00 AM |
Northport Exit Limitation |
07/15/2022 | 15:25:22 | Implementation table for East End and South Fork Operating Guideline
CANAL DRSS IN SERVICE – FULL SYSTEM Estimated start Time of 07/15/2022 15:25:00 and in effect until further notice |
07/15/2022 | 10:31:00 AM | Implementation table for East End and South Fork Operating Guideline
CANAL DRSS IN SERVICE – DVAR ONLY - E HAMP D-VAR I/S Estimated start Time of 07/15/2022 10:31:00 and estimated end time of 07/15/2022 15:00:00 |
06/21/2022 | 12:45:00 PM | The combined output of Northport 3 and 4 is limited to approximately 465MWN. Estimated start Time of 06/10/2022 00:01:00 and estimated end time of 06/24/2022 23:59:00 |
06/11/2022 | 4:25:00 PM | The combined output of Northport 3 and 4 is limited to approximately 465MWN. Estimated start Time of 06/10/2022 00:01:00 and estimated end time of 06/21/2022 23:59:00 |
05/13/2022 | 17:26:00 PM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 05/13/2022 17:26:00 and estimated end time of 12/31/2022 23:59:00 |
05/08/2022 | 11:50:00 PM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective immediately. Estimated start Time of 05/8/2022 23:50:00 and estimated end time of 12/31/2022 23:59:00 |
05/07/2022 | 06:50:00 PM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 05/07/2022 18:50:00 and estimated end time of 12/31/2022 23:59:00 |
05/06/2022 | 3:15:00 PM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective immediately. Estimated start Time of 05/6/2022 15:15:00 and estimated end time of 12/31/2022 23:59:00 |
05/02/2022 | 07:43:07 AM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 05/02/2022 07:43:07 and estimated end time of 05/06/2022 23:59:00 |
04/23/2022 | 3:16:34 PM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective immediately. Estimated start Time of 04/23/2022 15:16:34 and estimated end time of 12/31/2022 23:59:00 |
03/09/2022 | 18:50:00 PM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 03/09/2022 18:50:00 and estimated end time of 12/31/2022 23:59:00 |
03/09/2022 |
05:43:33 AM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 03/09/2022 05:43:33 and estimated end time of 12/31/2022 23:59:00 |
03/08/2022 | 01:20:57 PM | **TEST This is the Header Text** ** TEST This is the Body Text ** Estimated start Time of 03/08/2022 13:20:00 and estimated end time of 03/08/2022 13:30:00 |
12/28/2021 | 06:13:38 PM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 12/28/2021 18:12:00 and estimated end time of 12/31/2022 23:59:00 |
12/28/2021 | 12:30:47 AM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 12/28/2021 00:30:00 and estimated end time of 12/31/2021 23:59:00 |
11/22/2021 | 02:42:15 PM | Far Rockaway Generation Due to system conditions Far Rockaway generation may be required. Estimated Start Time of 11/22/2021 14:30:00 and Estimated End Time of 11/24/2021 23:59:59 Estimated start Time of 11/22/2021 14:30:00 and estimated end time of 11/24/2021 23:59:00 |
11/15/2021 | 10:16:57 AM | East of Riverhead Generation Required Additional on island generation required east of Riverhead due to line outages and contingencies. Estimated start Time of 11/15/2021 10:00:00 and estimated end time of 11/15/2021 23:59:00 |
10/16/2021 | 03:23:14 AM | East of Holbrook Generation Required Modification to end time of additional on island generation required east of Holbrook due to system conditions. Estimated start Time of 10/16/2021 00:01:00 and estimated end time of 10/16/2021 04:00:00 |
10/15/2021 | 11:05:33 PM | East of Holbrook Generation Required Additional on island generation required east of Holbrook due to system conditions. Estimated start Time of 10/16/2021 00:01:00 and estimated end time of 10/16/2021 11:00:00 |
09/24/2021 | 11:05:01 PM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 09/24/2021 23:00:00 and estimated end time of 12/31/2021 23:59:00 |
09/20/2021 | 07:46:41 PM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 09/20/2021 18:49:00 and estimated end time of 12/31/2021 23:59:00 |
09/19/2021 | 12:08:58 PM | Northport Oil Operation Due to system conditions, one (1) Northport Unit will be required on 75% oil while Y-50 is out of service. Estimated start Time of 09/20/2021 00:00:00 and estimated end time of 09/20/2021 23:59:00 |
09/19/2021 | 10:11:20 AM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 09/19/2021 10:02:00 and estimated end time of 12/31/2021 23:59:00 |
09/17/2021 | 01:56:17 PM | Northport Oil Operation For system reliability at loads above 3500MW at least (1) Northport unit must be operated on Oil fuel. End date for this post has been updated. Estimated start Time of 08/07/2021 16:00:00 and estimated end time of 09/19/2021 23:59:00 |
09/17/2021 | 08:56:01 AM | Northport Oil Operation Due to system conditions, (2) Northport units will be required on 75% Oil until further notice, to ensure system reliability. The post is updated to reflect the new end time. Estimated start Time of 08/09/2021 15:00:00 and estimated end time of 09/19/2021 23:59:00 |
08/25/2021 | 11:24:17 AM | Northport Oil Operation Due to system conditions, a 3rd Northport unit will be required on 75% Oil to ensure system reliability. Estimated start Time of 08/25/2021 08:00:00 and estimated end time of 08/27/2021 23:59:00 |
08/24/2021 | 08:13:01 AM | Northport Oil Operation Due to system conditions, a 3rd Northport unit will be required on 75% Oil to ensure system reliability. Estimated start Time of 08/25/2021 08:00:00 and estimated end time of 08/26/2021 23:59:00 |
08/11/2021 | 11:46:39 AM | Northport Oil Operation Due to system conditions, a 3rd Northport unit will be required on 75% Oil to ensure system reliability. Estimated start Time of 08/12/2021 07:00:00 and estimated end time of 08/13/2021 23:59:00 |
08/11/2021 | 11:28:02 AM | Y-49 Estimated Return Time The estimated return time for Y-49 is updated to be 10/15/2021 2359 hours. Estimated start Time of 08/11/2021 00:00:00 and estimated end time of 08/11/2021 23:59:00 |
08/09/2021 | 02:58:22 PM | Northport Oil Operation Due to system conditions, (2) Northport units will be required on 75% Oil until further notice, to ensure system reliability. Estimated start Time of 08/09/2021 15:00:00 and estimated end time of 12/31/2021 23:59:00 |
08/07/2021 | 04:13:19 PM | Northport Oil Operation For system reliability at loads above 3500MW at least (1) Northport unit must be operated on Oil fuel Estimated start Time of 08/07/2021 16:00:00 and estimated end time of 12/31/2021 23:59:00 |
07/17/2021 | 06:48:25 PM | On Island Generation Required Additional Northport and Port Jeff generation required due to transmission system conditions. Estimated start Time of 07/18/2021 00:01:00 and estimated end time of 07/18/2021 23:59:00 |
04/26/2021 | 10:41:56 PM | Implementation Tables for G.3 Table 4, which assumes BOTH West Bus DRSS and Wildwood DRSS in service, is effective immediately. Estimated start Time of 04/26/2021 22:30:00 and estimated end time of 12/31/2021 23:59:00 |
04/21/2021 | 09:08:16 AM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 04/21/2021 09:00:00 and estimated end time of 12/31/2021 23:59:00 |
04/21/2021 | 12:43:07 AM | Implementation Tables for G.3 Table 1 which assumes BOTH West Bus DRSS and Wildwood DRSS Out of Service is effective until further notice Estimated start Time of 04/21/2021 00:40:00 and estimated end time of 12/31/2021 23:59:00 |
04/12/2021 | 07:58:37 AM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 04/12/2021 07:45:00 and estimated end time of 12/31/2021 23:59:00 |
04/08/2021 | 05:12:37 PM | Implementation Tables for G.3 Table 4 which assumes both West Bus and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 04/08/2021 17:10:00 and estimated end time of 12/31/2021 23:59:00 |
04/04/2021 | 04:07:11 PM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 04/04/2021 16:00:00 and estimated end time of 12/31/2021 23:59:00 |
01/15/2021 | 03:50:52 PM | Implementation Tables for G.3 Table 4 which assumes both West Bus and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 01/15/2021 15:42:00 and estimated end time of 12/31/2021 23:59:00 |
01/14/2021 | 09:54:26 AM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 01/14/2021 09:43:00 and estimated end time of 12/31/2021 23:59:00 |
12/21/2020 | 03:42:17 AM | Implementation Tables for G.3 Table 4 which assumes both West Bus and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 12/21/2020 03:41:00 and estimated end time of 12/31/2020 23:59:00 |
12/19/2020 | 04:42:32 PM | SRE Northport Generation for Local Security SRE Northport 4 Generation for Local Security Estimated start Time of 12/20/2020 11:00:00 and estimated end time of 12/20/2020 23:59:00 |
12/19/2020 | 12:32:47 AM | Implementation Tables for G.3. Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 12/19/2020 00:15:00 and estimated end time of 12/21/2020 23:59:00 |
10/27/2020 | 05:52:36 PM | Implementation Tables for G.3 Table 4 which assumes both West Bus and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 10/27/2020 17:45:00 and estimated end time of 12/31/2020 23:59:00 |
10/25/2020 | 05:00:18 PM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 10/25/2020 17:00:00 and estimated end time of 10/31/2020 15:00:00 |
09/03/2020 | 04:40:39 PM | Neptune Limitation Neptune Intertie will be limited to 375 MW max for the duration of the posted hours due to system conditions. Estimated start Time of 09/02/2020 18:30:00 and estimated end time of 09/30/2020 23:59:00 |
09/02/2020 | 10:01:49 PM | Neptune Limitation Neptune Intertie will be limited to 375 MW max for the duration of the posted hours due to system conditions. Estimated start Time of 09/02/2020 18:30:00 and estimated end time of 09/04/2020 23:59:00 |
06/16/2020 | 10:40:31 AM | Implementation Tables for G.3 Table 4 which assumes both West Bus and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 06/16/2020 10:39:00 and estimated end time of 12/31/2020 23:59:00 |
06/16/2020 | 08:41:48 AM | Implementation Tables for G.3 Table 3, which assumes the West Bus DRSS out of service and Wildwood DRSS in service, is effective until further notice. Estimated start Time of 06/16/2020 08:05:00 and estimated end time of 12/31/2020 23:59:00 |
06/07/2020 | 04:41:20 PM | Implementation Tables for G.3 Table 4 which assumes both West Bus and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 06/07/2020 17:00:00 and estimated end time of 12/31/2020 23:59:00 |
06/06/2020 | 06:06:25 PM | Implementation Tables for G.3 Table 3 which assumes West Bus DRSS Out of Service and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 06/06/2020 15:04:00 and estimated end time of 12/31/2020 23:59:00 |
04/15/2020 | 07:42:18 PM | Far Rockaway Generation Far Rockaway generation will be needed due to transmission related work Estimated start Time of 04/13/2020 14:00:00 and estimated end time of 04/16/2020 23:59:00 |
04/15/2020 | 03:18:35 AM | Far Rockaway Generation Far Rockaway generation will be needed due to transmission related work Estimated start Time of 04/13/2020 14:00:00 and estimated end time of 04/15/2020 23:59:00 |
04/14/2020 | 10:53:56 AM | Far Rockaway Generation Far Rockaway generation will be needed due to transmission related work Estimated start Time of 04/13/2020 14:00:00 and estimated end time of 04/14/2020 23:59:00 |
04/13/2020 | 10:02:12 PM | Far Rockaway Generation Far Rockaway generation will be needed due to transmission related work Estimated start Time of 04/13/2020 14:00:00 and estimated end time of 04/14/2020 11:00:00 |
03/25/2020 | 08:14:31 PM | Far Rockaway Generation Far Rockaway generation will be needed due to transmission related work Estimated start Time of 03/26/2020 05:00:00 and estimated end time of 03/26/2020 22:00:00 Estimated start Time of 03/26/2020 05:00:00 and estimated end time of 03/26/2020 22:00:00 |
02/06/2020 | 05:50:11 PM | Implementation Tables for G.3 Table 4 which assumes both West Bus and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 02/06/2020 17:36:00 and estimated end time of 12/31/2020 23:59:00 |
02/05/2020 | 08:52:19 AM | Far Rockaway Generation Far Rockaway generation will be needed due to transmission related work Estimated start Time of 02/05/2020 07:00:00 and estimated end time of 02/05/2020 19:00:00 |
01/24/2020 | 12:17:40 PM | Neptune Limitation Neptune Intertie will be limited to 375 MW max for the duration of the posted hours due to system constraints. Estimated start Time of 01/27/2020 00:00:00 and estimated end time of 01/27/2020 23:59:00 |
01/09/2020 | 10:28:50 PM | SRE Northport Generation for Local Security Due to unscheduled maintenance on LIPA power system, Northport Steam unit #4 will remain online for local reliability. Estimated start Time of 01/10/2020 09:00:00 and estimated end time of 01/10/2020 21:00:00 |
12/31/2019 | 04:25:39 PM | Implementation Tables for G.3 Table 3 which assumes West Bus DRSS Out of Service and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 01/01/2020 00:00:00 and estimated end time of 01/31/2020 23:59:00 |
12/22/2019 | 06:59:45 AM | Far Rockaway Generation Due to system conditions Far Rockaway generation may be required. Estimated start Time of 12/22/2019 07:00:00 and estimated end time of 12/22/2019 15:00:00 |
12/19/2019 | 04:59:24 AM | Implementation Tables for G.3 Table 3 which assumes West Bus DRSS Out of Service and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 12/19/2019 02:49:00 and estimated end time of 12/31/2019 23:59:00 |
11/25/2019 | 09:27:31 AM | Test This is a test message. Estimated start Time of 11/26/2019 09:30:00 and estimated end time of 11/27/2019 22:50:00 |
11/08/2019 | 09:05:11 PM | Far Rock Generation Far Rockaway GT#1 will be online for local reliability Estimated start Time of 11/08/2019 17:31:00 and estimated end time of 11/09/2019 10:00:00 |
09/30/2019 | 12:48:43 PM | East End Generation Due to transmission work on the LIPA system, East end generation may be required for local security. Estimated start Time of 09/30/2019 12:30:00 and estimated end time of 10/03/2019 15:00:00 |
08/31/2019 | 12:32:29 PM | Implementation Tables for G.3 Table 4 which assumes both West Bus and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 08/31/2019 12:30:00 and estimated end time of 12/31/2019 23:59:00 |
08/30/2019 | 05:39:02 AM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 08/30/2019 02:30:00 and estimated end time of 12/31/2019 23:59:00 |
07/30/2019 | 08:07:35 AM | East End Generation Due to current system conditions additional generation may be required between the hours listed. Estimated start Time of 07/30/2019 08:00:00 and estimated end time of 07/30/2019 12:00:00 |
07/26/2019 | 07:31:38 AM | East End Generation Due to current system conditions additional generation may be required between the hours listed above. Estimated start Time of 07/26/2019 07:30:00 and estimated end time of 07/26/2019 23:59:00 |
07/05/2019 | 10:25:19 AM | DARU Barrett 2 Barrett 2 will be online all day on 7/8/19 due to work on the LIPA transmission system Estimated start Time of 07/08/2019 00:00:00 and estimated end time of 07/08/2019 23:59:00 |
07/05/2019 | 10:24:14 AM | DARU Barrett 1 Barrett 1 will be online all day on 7/8/19 due to work on the LIPA transmission system. Estimated start Time of 07/08/2019 00:00:00 and estimated end time of 07/08/2019 23:59:00 |
06/24/2019 | 06:43:37 PM | Implementation Tables for G.3 Table 4 which assumes both West Bus and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 06/24/2019 18:37:00 and estimated end time of 12/31/2019 23:59:00 |
06/19/2019 | 06:09:31 AM | Far Rockaway Generation Due to system conditions Far Rockaway generation may be required. Estimated start Time of 06/19/2019 05:00:00 and estimated end time of 06/19/2019 23:59:00 |
05/07/2019 | 06:09:28 PM | Implementation Tables for G.3 Table 4 which assumes both West Bus and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 05/07/2019 17:07:00 and estimated end time of 12/31/2019 23:59:00 |
05/07/2019 | 12:45:40 AM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 05/07/2019 00:40:00 and estimated end time of 05/08/2019 15:00:00 |
04/05/2019 | 09:55:31 AM | Far Rockaway Generation Due to system conditions Far Rockaway generation may be required. Estimated start Time of 04/05/2019 10:00:00 and estimated end time of 04/05/2019 23:00:00 |
02/22/2019 | 11:28:43 AM | DARU Port Jeff Steam Unit# 4 Port Jeff Steam Unit# 4 to remain online for local reliability reasons. Estimated start Time of 02/25/2019 06:00:00 and estimated end time of 02/26/2019 23:59:00 |
02/22/2019 | 11:12:52 AM | DARU Barrett Steam Unit# 1 Barrett Steam Unit# 1 will remain online for local reliability reasons. Estimated start Time of 02/25/2019 00:00:00 and estimated end time of 02/25/2019 23:59:00 |
02/20/2019 | 11:14:44 AM | DARU Port Jeff Steam Unit# 4 Port Jeff Steam Unit# 4 will remain online for local reliability reasons. Time extended again by one (1) day. Estimated start Time of 02/19/2019 06:00:00 and estimated end time of 02/22/2019 23:59:00 |
02/19/2019 | 10:24:43 AM | DARU Port Jeff Steam Unit# 4 Port Jeff Steam Unit# 4 will remain online for local reliability reasons. Time extended by one (1) day. Estimated start Time of 02/19/2019 06:00:00 and estimated end time of 02/21/2019 23:59:00 |
02/15/2019 | 10:35:08 AM | DARU Port Jeff Steam Unit# 4 Port Jeff Steam Unit# 4 will remain online for local reliability reasons. Estimated start Time of 02/19/2019 06:00:00 and estimated end time of 02/20/2019 23:59:00 |
02/11/2019 | 10:41:38 AM | DARU Port Jeff Steam Unit Port Jeff Steam Unit# 4 will remain online for local reliability reasons. Estimated start Time of 02/13/2019 00:00:00 and estimated end time of 02/15/2019 23:59:00 |
02/08/2019 | 10:22:24 AM | DARU Port Jefferson 4 Port Jefferson 4 will be online to secure the LIPA transmission system during system work. Estimated start Time of 02/11/2019 06:00:00 and estimated end time of 02/12/2019 23:59:00 |
01/29/2019 | 11:01:02 AM | DARU Port Jefferson Steam Unit #4 Port Jefferson Steam Unit# 4 will be online for Local Security Requirement Estimated start Time of 01/31/2019 00:00:00 and estimated end time of 02/01/2019 23:59:00 |
01/28/2019 | 05:01:17 PM | Implementation Tables for G.3 Table 4 which assumes both West Bus and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 01/28/2019 16:00:00 and estimated end time of 12/31/2019 23:59:00 |
01/28/2019 | 04:55:07 PM | Implementation Tables for G.3 Table 3 which assumes West Bus DRSS Out of Service and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 01/28/2019 16:00:00 and estimated end time of 12/31/2019 23:59:00 |
01/28/2019 | 02:11:42 PM | DARU Port Jefferson Steam Unit #4 Port Jefferson Steam Unit# 4 will be online for reliability forecast beyond next day due to cold weather. Estimated start Time of 01/30/2019 06:00:00 and estimated end time of 01/30/2019 23:59:00 |
01/27/2019 | 06:18:32 PM | Implementation Tables for G.3 Table 3 which assumes West Bus DRSS Out of Service and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 01/27/2019 18:13:00 and estimated end time of 01/28/2019 15:00:00 |
01/22/2019 | 01:01:37 PM | DARU Port Jeff Steam Port Jefferson Steam Unit# 4 will be online for local security requirements. Estimated start Time of 01/24/2019 00:00:00 and estimated end time of 01/25/2019 23:59:00 |
01/18/2019 | 12:05:22 PM | Port Jefferson 4 DARU PJ 4 will be online for local security requirements. Estimated start Time of 01/20/2019 00:00:00 and estimated end time of 01/20/2019 23:59:00 |
01/17/2019 | 02:42:03 PM | DARU Npt 1 & 2, E W Barrett 1 & 2 Northport 1 & 2 and Barrett 1 & 2 will stay online due to unit downtime requirements if they were to be de-committed. Estimated start Time of 01/19/2019 00:00:00 and estimated end time of 01/20/2019 23:59:00 |
01/14/2019 | 11:09:01 AM | DARU Barrett Steam Unit# 2 Barrett Steam Unit# 2 will be online for local reliability. Estimated start Time of 01/16/2019 00:00:00 and estimated end time of 01/16/2019 23:59:00 |
01/09/2019 | 05:04:23 PM | Implementation Tables for G.3 Table 4 which assumes BOTH West Bus DRSS and Wildwood DRSS In Service is effective immediately until further notice Estimated start Time of 01/09/2019 17:00:00 and estimated end time of 12/31/2019 23:59:00 |
01/08/2019 | 11:12:02 PM | Implementation Tables for G.3. Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 01/09/2019 00:00:00 and estimated end time of 01/09/2019 23:59:00 |
12/07/2018 | 11:10:17 AM | DARU Barrett Steam Unit #2 Barrett Steam Unit #2 will be online for local reliability. Estimated start Time of 12/10/2018 00:00:00 and estimated end time of 12/11/2018 23:59:00 |
12/07/2018 | 11:07:15 AM | DARU Barrett Steam Unit #2 Barrett Steam Unit #2 will be online for reliability beyond forecast. Estimated start Time of 12/09/2018 00:00:00 and estimated end time of 12/09/2018 23:59:00 |
12/04/2018 | 10:36:45 AM | DARU Barrett Steam Unit #2 Barrett Steam Unit #2 will be online for local reliability. Estimated start Time of 12/06/2018 00:00:00 and estimated end time of 12/06/2018 23:59:00 |
11/30/2018 | 02:52:50 PM | Transmission Constraint Due to scheduled maintenance extra generation may be required east of Holbrook Estimated start Time of 11/30/2018 14:45:00 and estimated end time of 11/30/2018 18:00:00 |
11/30/2018 | 10:45:13 AM | DARU Barrett Steam for Local Security Barrett Steam Unit 2 will remain online for Local Security reasons. Estimated start Time of 12/03/2018 00:00:00 and estimated end time of 12/04/2018 23:59:00 |
11/08/2018 | 12:02:48 PM | DARU Northport Steam for ARR 28A Northport Unit# 3 will remain online for NYSRC Rule no. ARR 28A. Estimated start Time of 11/10/2018 00:00:00 and estimated end time of 11/12/2018 23:59:00 |
10/19/2018 | 02:39:58 PM | DARU Npt 2 for NYSRC RR . ARR 28A Northport 2 will be online to satisfy NYSRC Reliability Rule no. ARR 28A which requires 1 Northport unit to be online during light load conditions. Estimated start Time of 10/21/2018 00:00:00 and estimated end time of 10/23/2018 23:59:00 |
10/08/2018 | 03:34:37 PM | test testing i123 Estimated start Time of 10/12/2018 00:02:00 and estimated end time of 10/31/2018 02:05:00 |
10/05/2018 | 01:22:05 PM | Implementation Tables for G.3 Table 4 which assumes BOTH West Bus DRSS and Wildwood DRSS In Service is effective immediately until further notice Estimated start Time of 10/05/2018 13:17:00 and estimated end time of 12/31/2018 23:59:00 |
10/04/2018 | 03:54:56 PM | DARU Northport Steam Unit Northport Unit# 2 will remain online for Local Security Requirements. Estimated start Time of 10/06/2018 00:00:00 and estimated end time of 10/07/2018 23:59:00 |
10/04/2018 | 08:45:09 AM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 10/03/2018 09:15:00 and estimated end time of 10/05/2018 23:59:00 |
10/03/2018 | 10:55:29 AM | DARU Port Jeff Steam Units Port Jeff Steam Units will be online to support Transmission related work. On 10/05/18 Unit# 4 should be online starting at 0600 hrs. On 10/07/18 both units should remain online for Downtime Requirements. Estimated start Time of 10/05/2018 00:00:00 and estimated end time of 10/10/2018 23:59:00 |
10/03/2018 | 05:16:07 AM | Implementation Tables for G.3 Table 4 which assumes BOTH West Bus DRSS and Wildwood DRSS In Service is effective immediately until further notice Estimated start Time of 10/03/2018 05:00:00 and estimated end time of 12/31/2018 23:59:00 |
10/02/2018 | 11:16:59 AM | DARU Port Jeff Steam Port Jeff Steam Unit# 3 to remain online for Unit Downtime Requirements. Estimated start Time of 10/04/2018 00:00:00 and estimated end time of 10/04/2018 23:59:00 |
10/01/2018 | 06:08:33 AM | Implementation Tables for G.3 Table 3 which assumes West Bus DRSS Out of Service and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 10/01/2018 06:00:00 and estimated end time of 10/03/2018 23:59:00 |
09/27/2018 | 08:41:26 PM | Due to transmission limitations East of Pilgrim additional generation will be required. Estimated start Time of 09/27/2018 20:40:00 and estimated end time of 09/27/2018 23:59:00 |
09/25/2018 | 10:50:50 AM | DARU Port Jeff Steam Port Jeff Steam Unit# 3 will be online to prevent a contingency overload while transmission system work is conducted Estimated start Time of 09/27/2018 00:00:00 and estimated end time of 09/27/2018 23:59:00 |
09/20/2018 | 10:22:06 AM | DARU Barrett Steam Barrett Steam Unit# 1 must be online to prevent a contingency overload while transmission system work is conducted Estimated start Time of 09/22/2018 00:00:00 and estimated end time of 09/22/2018 23:59:00 |
09/09/2018 | 12:53:54 AM | Far Rockaway GT#1 will be online for local reliability Estimated start Time of 09/08/2018 12:00:00 and estimated end time of 09/09/2018 06:00:00 |
09/09/2018 | 12:53:01 AM | Far Rockaway GT#1 will be online for local reliability Estimated start Time of 09/08/2018 12:00:00 and estimated end time of 09/09/2018 23:00:00 |
09/08/2018 | 12:55:42 PM | Far Rockaway GT#1 will be online for local reliability Estimated start Time of 09/08/2018 12:00:00 and estimated end time of 09/08/2018 23:59:00 |
09/07/2018 | 07:41:30 AM | Due to transmission limitations East of Pilgrim additional generation will be required. Estimated start Time of 09/07/2018 07:00:00 and estimated end time of 09/07/2018 23:59:00 |
09/04/2018 | 10:28:17 AM | ARR 28C DARU Northport Units# 1,2 & 4 and Port Jeff Unit# 4 will be online for ARR 28C. Estimated start Time of 09/06/2018 00:00:00 and estimated end time of 09/06/2018 23:59:00 |
08/31/2018 | 12:03:00 PM | DARU Steam Units for ARR 28C Northport Units# 1,2 & 4 and Port Jeff Unit# 4 will remain online for ARR 28C. Northport Unit# 2 will come online at 06:00 hrs. Estimated start Time of 09/04/2018 00:00:00 and estimated end time of 09/04/2018 23:59:00 |
08/31/2018 | 11:59:46 AM | DARU Steam Units Northport Units# 1 & 4 will remain online for Unit Downtime Requirements. Port Jeff Unit# 4 will remain online for ARR 28C on 9/2 and Unit Downtime Requirements on 9/3. Estimated start Time of 09/02/2018 00:00:00 and estimated end time of 09/03/2018 23:59:00 |
08/29/2018 | 11:25:52 AM | DARU Steam Unit for Downtime Requirements Port Jeff Steam Unit# 4 will be online for Unit Downtime Requirements. Estimated start Time of 08/31/2018 00:00:00 and estimated end time of 08/31/2018 23:59:00 |
08/28/2018 | 01:13:44 PM | 'NYSRC Reliability Rule no. ARR 28C Northport 2, 3, 4 and Port Jefferson 3 will be online for 'NYSRC Reliability Rule no. ARR 28C. Estimated start Time of 08/30/2018 00:00:00 and estimated end time of 08/30/2018 23:59:00 |
08/27/2018 | 11:43:29 AM | DARU Steam Units DARU Barrett Units 1 & 2 to avoid decommitment due to DARU of separate units. DARU Northport Units 1, 2, 3 & 4 and Port Jeff Units 3 & 4 for ARR 28C. Estimated start Time of 08/29/2018 00:00:00 and estimated end time of 08/29/2018 23:59:00 |
08/24/2018 | 01:54:02 PM | Revision: DARU Unit for ARR 28C Northport Steam Unit # 1 will be online for ARR 28C. Estimated start Time of 08/28/2018 06:00:00 and estimated end time of 08/28/2018 23:59:00 |
08/24/2018 | 01:49:48 PM | DARU Units for ARR 28C Following Steam Units will be online for ARR 28C: Northport # 2 starting at 10:00 on 8/27/18 Northport # 3 starting at 06:00 on 8/27/18 Northport # 4 starting at 00:00 on 8/27/18 Port Jeff # 3 starting at 00:00 on 8/27/18 Estimated start Time of 08/27/2018 00:00:00 and estimated end time of 08/28/2018 23:59:00 |
08/24/2018 | 12:14:44 PM | DARU Unit for ARR 28C Northport Steam Unit # 1 will be online for ARR 28C Estimated start Time of 08/28/2018 00:00:00 and estimated end time of 08/28/2018 23:59:00 |
08/24/2018 | 12:12:00 PM | DARU Units for ARR 28C Northport Steam Units # 2, 3 & 4 and Port Jeff Steam Unit # 3 will be online for ARR 28C Estimated start Time of 08/27/2018 00:00:00 and estimated end time of 08/28/2018 23:59:00 |
08/24/2018 | 12:04:26 PM | DARU Untis to Avoid Decommitment Barrett Stem Units # 1 & 2 will be online to avoid decommitment due to DARU of separate unit Estimated start Time of 08/27/2018 00:00:00 and estimated end time of 08/28/2018 23:59:00 |
08/24/2018 | 12:00:15 PM | DARU Units for Downtime Requirements Barrett Steam Units # 1 & 2, Northport Steam Unit # 4 and Port Jeff Stem Unit # 3 will be online for Unit Downtime Requirements. Estimated start Time of 08/26/2018 00:00:00 and estimated end time of 08/26/2018 23:59:00 |
08/16/2018 | 11:52:49 AM | DARU units for ARR 28C Northport Steam Unit # 4 will be online for ARR 28C Estimated start Time of 08/18/2018 00:00:00 and estimated end time of 08/18/2018 23:59:00 |
08/15/2018 | 11:22:12 AM | DARU units for ARR 28C Northport Steam Units # 1, 3 & 4 and Port Jeff Steam Unit # 4 will be online for ARR 28C Estimated start Time of 08/17/2018 00:00:00 and estimated end time of 08/17/2018 23:59:00 |
08/14/2018 | 10:30:08 AM | DARU units for ARR 28C Northport Steam Units #2, 3 & 4 and Port Jeff Steam Unit #3 & 4 will be online for ARR 28C. Estimated start Time of 08/16/2018 00:00:00 and estimated end time of 08/16/2018 23:59:00 |
08/13/2018 | 12:58:15 PM | East End Generation All east end generation will need to run due to post contingency STE violations on the east end with Total south fork load greater than 140 MW Estimated start Time of 08/11/2018 16:00:00 and estimated end time of 08/16/2018 23:59:00 |
08/13/2018 | 10:28:14 AM | Npt & PJ DARU Northport Steam Units #2, 3 & 4 and Port Jeff Steam Unit #4 will be online for ARR 28C Estimated start Time of 08/15/2018 00:00:00 and estimated end time of 08/15/2018 23:59:00 |
08/11/2018 | 04:49:58 PM | East End Generation All east end generation will need to run due to post contingency STE violations on the east end with Total south fork load greater than 140 MW Estimated start Time of 08/11/2018 16:00:00 and estimated end time of 08/14/2018 23:59:00 |
08/10/2018 | 01:20:01 PM | DARU units for ARR 28C Northport Steam Units # 3 & 4 will be online for ARR 28C Estimated start Time of 08/13/2018 00:00:00 and estimated end time of 08/14/2018 23:59:00 |
08/10/2018 | 01:17:12 PM | DARU Units for Downtime Requirements Northport Steam Units # 3 & 4 will be online for Unit Downtime Requirements. Estimated start Time of 08/12/2018 00:00:00 and estimated end time of 08/12/2018 23:59:00 |
08/08/2018 | 11:24:07 AM | DARU units for ARR 28C Northport Steam Units #1, 3 & 4 and Port Jeff Steam Unit #4 will be online for ARR 28C Estimated start Time of 08/10/2018 00:00:00 and estimated end time of 08/10/2018 23:59:00 |
08/08/2018 | 12:49:46 AM | Implementation Tables for G.3 Table 4 which assumes BOTH West Bus DRSS and Wildwood DRSS In Service is effective immediately until further notice Estimated start Time of 08/08/2018 00:45:00 and estimated end time of 12/31/2999 23:59:00 |
08/07/2018 | 09:27:59 PM | Implementation Tables for G.3 Table 3 which assumes West Bus DRSS Out of Service and Wildwood DRSS In Service is effective until further notice. Estimated start Time of 08/07/2018 20:42:00 and estimated end time of 08/14/2018 23:59:00 |
08/07/2018 | 11:36:38 AM | DARU units for ARR 28C Northport Steam Unit #1, 3 & 4 and Port Jeff Steam Unit #4 will be online for ARR 28C Estimated start Time of 08/09/2018 00:00:00 and estimated end time of 08/09/2018 23:59:00 |
08/06/2018 | 02:41:58 PM | DARU Port Jeff Steam Unit #3 Pt. Jeff Steam Unit #3 will be online for local reliability. Estimated start Time of 08/08/2018 00:00:00 and estimated end time of 08/09/2018 23:59:00 |
08/06/2018 | 11:15:40 AM | DARU units for ARR 28C Northport Steam Units #1, 3 & 4 and Port Jeff Steam Unit #4 will be online for ARR 28C Estimated start Time of 08/08/2018 00:00:00 and estimated end time of 08/08/2018 23:59:00 |
08/03/2018 | 11:36:30 AM | DARU units for ARR 28C Northport Steam Unit #1, 3 & 4 and Port Jeff Steam Unit #3 will be online for ARR 28C Estimated start Time of 08/05/2018 00:00:00 and estimated end time of 08/07/2018 23:59:00 |
07/16/2018 | 01:43:16 PM | DARU unit for ARR 28C Port Jefferson Unit# 4 will be online for ARR 28C. Estimated start Time of 07/18/2018 00:00:00 and estimated end time of 07/18/2018 23:59:00 |
07/16/2018 | 11:02:28 AM | DARU units for ARR 28C Northport Units # 2 and 4 will be online for ARR 28C Estimated start Time of 07/18/2018 00:00:00 and estimated end time of 07/18/2018 23:59:00 |
07/13/2018 | 10:53:28 AM | DARU units for ARR 28C Port Jefferson# 4 and Northport# 2,3,4 will be online for ARR 28C. Estimated start Time of 07/16/2018 00:00:00 and estimated end time of 07/17/2018 23:59:00 |
07/13/2018 | 10:51:45 AM | DARU Port Jefferson# 4 and Northport # 2,3,4 will be online for reliability beyond forecast. Estimated start Time of 07/15/2018 00:00:00 and estimated end time of 07/15/2018 23:59:00 |
07/12/2018 | 01:18:51 PM | Port Jefferson 4 DARU Port Jefferson 4 DARU will be online due to gas leak on main gas supply. Estimated start Time of 07/14/2018 00:00:00 and estimated end time of 07/14/2018 23:59:00 |
06/29/2018 | 11:34:16 AM | DARU units for ARR 28C Northport Steam Unit #1, 3 & 4 and Port Jeff Steam Unit #3 will be online for ARR 28C Estimated start Time of 07/01/2018 00:00:00 and estimated end time of 07/01/2018 23:59:00 |
06/29/2018 | 11:28:15 AM | DARU units for ARR 28C Northport Steam Unit #1, 3 & 4 and Port Jeff Steam Unit #3 will be online for ARR 28C Estimated start Time of 06/29/2018 00:00:00 and estimated end time of 06/29/2018 23:59:00 |
06/13/2018 | 10:31:25 AM | DARU - Barrett Steam Unit #1 & #2 Barrett Steam Unit #1 and #2 will be online for local reliability Estimated start Time of 06/15/2018 00:00:00 and estimated end time of 06/15/2018 23:59:00 |
06/11/2018 | 11:35:43 AM | Test Testing new link on the new website Estimated start Time of 06/11/2018 12:00:00 and estimated end time of 06/11/2018 13:00:00 |
06/05/2018 | 03:21:55 PM | Pt. Jeff GTs 2 and 3 Pt. Jeff GTs 2 and 3 will be dispatched for local reliability Estimated start Time of 06/05/2018 14:30:00 and estimated end time of 06/05/2018 22:00:00 |
06/05/2018 | 01:19:39 PM | Caithness Caithness will be dispatched on duct burners for local reliability. Estimated start Time of 06/05/2018 13:17:00 and estimated end time of 06/05/2018 22:00:00 |
05/07/2018 | 05:06:26 PM | Implementation Tables for G.3 Table 4 which assumes BOTH West Bus DRSS and Wildwood DRSS In Service is effective immediately until further notice Estimated start Time of 05/07/2018 17:00:00 and estimated end time of 12/31/2018 23:59:00 |
05/07/2018 | 05:05:31 PM | TVR Guidance TVR Guidance - "8KD West Bus (Holtsville) DRSS and 8DV Randall Rd (Wildwood) DRSS In Service" is in effect until further notice. Estimated start Time of 05/07/2018 17:00:00 and estimated end time of 12/31/2018 23:59:00 |
04/30/2018 | 11:28:42 AM | TVR Guidance TVR Guidance - "8KD West Bus (Holtsville) DRSS In Service" is in effect until further notice. Estimated start Time of 05/01/2018 00:01:00 and estimated end time of 05/04/2018 23:59:00 |
04/29/2018 | 05:29:09 PM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 04/29/2018 08:15:00 and estimated end time of 05/04/2018 23:59:00 |
04/13/2018 | 02:27:41 PM | DARU of EF Barrett #2 EF Barrett #2 must be online to prevent an overload while transmission system work is conducted Estimated start Time of 04/17/2018 00:00:00 and estimated end time of 04/20/2018 23:00:00 |
04/12/2018 | 02:22:57 PM | DARU - Pt Jeff Steam Unit #3 Pt. Jeff Steam Unit #3 will be online for local reliability. Estimated start Time of 04/14/2018 00:01:00 and estimated end time of 04/14/2018 23:59:00 |
04/12/2018 | 02:21:15 PM | Implementation Tables for G.3 Table 4 which assumes BOTH West Bus DRSS and Wildwood DRSS In Service is effective immediately until further notice. Estimated start Time of 03/19/2018 19:45:00 and estimated end time of 12/31/2018 23:59:00 |
03/14/2018 | 11:04:50 AM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective until further notice. Estimated start Time of 03/13/2018 10:25:00 and estimated end time of 12/31/2018 23:59:00 |
02/01/2018 | 08:05:27 PM | Implementation Tables for G.3 Table 4 which assumes BOTH West Bus DRSS and Wildwood DRSS In Service is effective immediately until further notice. Estimated start Time of 02/01/2018 20:00:00 and estimated end time of 12/31/2018 23:59:00 |
01/30/2018 | 09:30:33 AM | Implementation Tables for G.3 Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective immediately with tentative end date. Estimated start Time of 01/29/2018 11:40:00 and estimated end time of 03/31/2018 23:59:00 |
01/09/2018 | 10:44:30 AM | DARU - Barrett Steam Unit #1 Barrett Steam Unit #1 will be online for local reliability Estimated start Time of 01/11/2018 00:00:00 and estimated end time of 01/11/2018 23:59:00 |
12/07/2017 | 01:25:24 PM | REVISED - Northport 3 will be online for PSEGLI transmission related work for 12/10@18:00 - 12/11@23:59 Estimated start Time of 12/10/2017 18:00:00 and estimated end time of 12/11/2017 23:59:00 |
12/07/2017 | 11:26:13 AM | Northport 4 will be online for PSEGLI transmission related work. Estimated start Time of 12/10/2017 18:00:00 and estimated end time of 12/11/2017 23:59:00 |
12/07/2017 | 11:17:12 AM | Low Load Voltage Control Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/17/2017 00:00:00 and estimated end time of 12/10/2017 23:59:00 |
12/04/2017 | 01:06:57 PM | Low Load Voltage Control Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/17/2017 00:00:00 and estimated end time of 12/08/2017 23:59:00 |
12/02/2017 | 07:49:24 AM | Test This is a test Estimated start Time of 12/02/2017 07:48:00 and estimated end time of 12/02/2017 08:00:00 |
11/29/2017 | 10:51:56 AM | Low Load Voltage Control Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/17/2017 00:00:00 and estimated end time of 12/05/2017 23:59:00 |
11/27/2017 | 10:25:30 AM | Low Load Voltage Control Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/17/2017 00:00:00 and estimated end time of 11/30/2017 23:59:00 |
11/20/2017 | 10:28:48 AM | Low Load Voltage Control Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/17/2017 00:00:00 and estimated end time of 11/28/2017 23:59:00 |
11/16/2017 | 11:18:41 AM | Low Load Voltage Control Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/17/2017 00:00:00 and estimated end time of 11/21/2017 23:59:00 |
11/15/2017 | 10:27:07 AM | Low Load Voltage Control Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/17/2017 00:00:00 and estimated end time of 11/17/2017 23:59:00 |
11/13/2017 | 01:22:59 PM | Northport 4 DARU for Low Load Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/15/2017 00:00:00 and estimated end time of 11/16/2017 23:59:00 |
11/09/2017 | 02:42:02 PM | Low Load Voltage Control Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/11/2017 00:00:00 and estimated end time of 11/14/2017 23:59:00 |
11/06/2017 | 10:30:40 AM | Northport 4 DARU for voltage control Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/09/2017 00:00:00 and estimated end time of 11/10/2017 23:59:00 |
11/03/2017 | 09:58:58 AM | Northport 4 DARU for voltage control Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/06/2017 00:00:00 and estimated end time of 11/08/2017 23:59:00 |
11/02/2017 | 12:56:01 PM | Northport Steam Unit #4 Northport 4 will be online for NYSRC Reliability Rule - ARR 28A Estimated start Time of 11/04/2017 00:00:00 and estimated end time of 11/05/2017 23:59:00 |
09/08/2017 | 11:13:11 AM | PJ Steam Unit #4 Port Jeff Steam Unit #4 will be online for Local Reliability Estimated start Time of 09/09/2017 00:01:00 and estimated end time of 09/10/2017 23:59:00 |
09/07/2017 | 04:47:58 PM | PJ Steam Unit #4 Port Jeff Steam Unit #4 will be online for Local Reliability Estimated start Time of 09/09/2017 00:01:00 and estimated end time of 09/09/2017 23:59:00 |
08/18/2017 | 07:49:19 AM | East end generation Forecast for weekend load on the south fork may require generating units to be dispatched for local security Estimated start Time of 08/19/2017 06:00:00 and estimated end time of 08/20/2017 23:00:00 |
08/10/2017 | 08:14:19 AM | East end generation Forecast for weekend load on the South Fork may require generating units to be dispatched for local security Estimated start Time of 08/12/2017 07:00:00 and estimated end time of 08/13/2017 23:00:00 |
08/04/2017 | 08:25:34 AM | East end generation Forecast for weekend load on the south fork may require generating units to be dispatched of local security Estimated start Time of 08/05/2017 07:00:00 and estimated end time of 08/06/2017 23:00:00 |
08/01/2017 | 02:34:27 PM | East End Generation Limitations Do to transmission work on the LIPA system , Port Jeff, Shoreham, Wading River, Holtsville, Caithness, NYPA Flynn, Global, Southampton, East Hampton, Southold generation and CSC must not exceed 810 Mw with Long Island Control Area load at 2300 Mw and must be greater than 770 Mw at a LICA load of 3000 Mw. Estimated start Time of 08/03/2017 23:00:00 and estimated end time of 08/04/2017 10:00:00 |
07/27/2017 | 07:26:25 AM | East end generation forecast for weekend load on the south fork may require generating units to be dispatched for local security Estimated start Time of 07/29/2017 07:00:00 and estimated end time of 07/30/2017 23:59:00 |
07/21/2017 | 08:13:57 AM | East end generation Forecast for weekend load on the South Fork may require generating units to be dispatched for local security Estimated start Time of 07/22/2017 06:00:00 and estimated end time of 07/23/2017 23:59:00 |
07/17/2017 | 10:50:40 AM | DARU Units for ARR 28C Northport #3 & #4, and Port Jeff Unit #4 will be online for ARR 28C. Estimated start Time of 07/19/2017 00:00:00 and estimated end time of 07/21/2017 23:59:00 |
07/14/2017 | 08:14:42 AM | east end generation Forecasted load on the South fork may require generating units to be dispatched for local security Estimated start Time of 07/15/2017 07:00:00 and estimated end time of 07/16/2017 23:59:00 |
07/07/2017 | 08:06:06 AM | East end generation forecast for weekend load on the south fork may require generating units to be dispatched for local security Estimated start Time of 07/08/2017 07:00:00 and estimated end time of 07/09/2017 23:59:00 |
07/01/2017 | 06:46:04 AM | South Fork Generation Forecast for weekend load on the south fork may require generating units to be dispatched for local security. Estimated start Time of 07/01/2017 07:00:00 and estimated end time of 07/02/2017 23:59:00 |
06/20/2017 | 11:29:42 AM | DARU - PJ Steam Unit #4 Port Jeff Steam Unit #4 will be online for Loss of 138-881 & 138-882 on 138-871 with CSC OOS Estimated start Time of 06/22/2017 00:00:00 and estimated end time of 06/22/2017 23:59:00 |
06/16/2017 | 02:17:15 PM | 2HU GT 1 DARU The reason for the DARU is the contingency loss of 69-260 on 69-261 with 69-270 out of service. Estimated start Time of 06/18/2017 13:00:00 and estimated end time of 06/18/2017 20:00:00 |
06/02/2017 | 02:00:34 PM | Barrett Steam Unit #1 will be online for local reliability Estimated start Time of 06/02/2017 06:00:00 and estimated end time of 06/08/2017 23:59:00 |
05/31/2017 | 10:36:17 AM | Barrett Steam Unit #1 will be online for local reliability Estimated start Time of 06/02/2017 06:00:00 and estimated end time of 06/04/2017 23:59:00 |
05/27/2017 | 12:51:19 PM | Implementation Tables for G-R3: Table 4 which assumes BOTH West Bus DRSS and Wildwood DRSS ? In Service is effective immediately. Estimated start Time of 05/27/2017 12:48:00 and estimated end time of 12/31/2017 00:00:00 |
05/27/2017 | 03:50:14 AM | Implementation Tables for G-R3: Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective immediately. Estimated start Time of 05/27/2017 03:04:00 and estimated end time of 05/30/2017 23:59:00 |
05/24/2017 | 01:31:32 PM | Barrett Steam Unit #2 will be online for local reliability Estimated start Time of 05/20/2017 14:00:00 and estimated end time of 05/30/2017 23:59:00 |
05/22/2017 | 09:56:18 AM | Barrett Steam Unit #2 will be online for local reliability Estimated start Time of 05/20/2017 14:00:00 and estimated end time of 05/26/2017 23:59:00 |
05/19/2017 | 01:30:08 PM | Far Rockaway GT #1 will be online for local reliability. Estimated start Time of 05/22/2017 17:00:00 and estimated end time of 05/22/2017 22:59:00 |
05/18/2017 | 01:58:02 PM | Barrett Steam Unit #2 will be online for local reliability Estimated start Time of 05/20/2017 14:00:00 and estimated end time of 05/23/2017 23:59:00 |
05/18/2017 | 01:57:17 PM | Barrett Steam Unit #1 will be online for local reliability. Estimated start Time of 05/20/2017 00:00:00 and estimated end time of 05/20/2017 23:59:00 |
05/12/2017 | 11:46:54 AM | Implementation Tables for G-R3 Table 4 which assumes BOTH West Bus DRSS and Wildwood DRSS - In Service is effective immediately. Estimated start Time of 05/12/2017 11:43:00 and estimated end time of 12/31/2017 23:59:00 |
05/11/2017 | 10:53:47 AM | Barrett Steam Unit #1 will be online for local reliability Estimated start Time of 05/08/2017 00:00:00 and estimated end time of 05/17/2017 23:59:00 |
05/09/2017 | 06:06:33 AM | Implementation Tables for G-R3 Table 3 which assumes West Bus DRSS Out of Service and Wildwood DRSS In Service is effective immediately. Estimated start Time of 05/09/2017 06:03:00 and estimated end time of 05/12/2017 15:00:00 |
05/05/2017 | 02:32:41 PM | Barrett Steam Unit #1 will be online for local reliability Estimated start Time of 05/08/2017 00:00:00 and estimated end time of 05/13/2017 23:59:00 |
05/04/2017 | 06:38:23 PM | Implementation Tables for G-R3 Table 4 which assumes BOTH West Bus DRSS and Wildwood DRSS - In Service is effective immediately. Estimated start Time of 05/04/2017 18:26:00 and estimated end time of 12/31/2017 23:59:00 |
05/02/2017 | 07:43:16 PM | Implementation Tables for G-R3: Table 2 which assumes West Bus DRSS In Service and Wildwood DRSS Out of Service is effective immediately. Estimated start Time of 05/02/2017 08:00:00 and estimated end time of 05/05/2017 15:00:00 |
04/28/2017 | 10:30:18 AM | Northport 1 will be online for reliability forecast beyond next day. Estimated start Time of 04/30/2017 00:00:00 and estimated end time of 04/30/2017 23:59:00 |
03/25/2017 | 07:39:59 AM | Additional generation will be online for local reliability Due to current system conditions addition generation may be required between the hours listed above. Estimated start Time of 03/25/2017 01:57:00 and estimated end time of 03/25/2017 22:00:00 |
03/25/2017 | 04:43:47 AM | Additional generation will be online for local reliability Due to current system conditions addition generation may be required between the hours listed above. Estimated start Time of 03/25/2017 01:57:00 and estimated end time of 03/25/2017 09:00:00 |
03/17/2017 | 02:44:24 PM | PSEGLI Transmission Operations, PSEG ER&T, Versify and various generators met on Thursday March 16, 2017 at the PSEGLI Uniondale Office. The group reviewed and tested the new Generation Outage Management System. Estimated start Time of 03/16/2017 09:00:00 and estimated end time of 03/16/2017 13:59:00 |
02/27/2017 | 02:40:57 PM | Far Rockaway GT#1 will be online for local reliability Estimated start Time of 03/01/2017 08:00:00 and estimated end time of 03/01/2017 18:59:00 |
02/24/2017 | 10:24:48 AM | The total East End generation plus import (CSC, Port Jefferson, Flynn, Caithness, Shoreham, Islip RR, Stonybrook, Holtsville, Wading River, Southold, East Hampton) must be limited as follows LICA Load 1600 Mw: < 740 Mw, LICA Load 1750 Mw: < 790 Mw, LICA Load 1950 Mw: < 840 Mw, LICA Load 2050 Mw: < 875 Mw, LICA Load 2150 Mw: < 890 Mw, LICA Load 2350 Mw: < 945 Mw. Estimated start Time of 02/28/2017 01:00:00 and estimated end time of 02/28/2017 18:00:00 |
02/24/2017 | 10:22:10 AM | The total East End generation plus import (CSC, Port Jefferson, Flynn, Caithness, Shoreham, Islip RR, Stonybrook, Holtsville, Wading River, Southold, East Hampton) must be limited as follows LICA Load 1600 Mw: < 740 Mw, LICA Load 1750 Mw: < 790 Mw, LICA Load 1950 Mw: < 840 Mw, LICA Load 2050 Mw: < 875 Mw, LICA Load 2150 Mw: < 890 Mw, LICA Load 2350 Mw: < 945 Mw. Estimated start Time of 02/25/2017 01:00:00 and estimated end time of 02/25/2017 18:00:00 |
02/21/2017 | 03:26:05 PM | The combined output of Northport 3 and 4 is limited to approximately 500 MW. Estimated start Time of 02/23/2017 00:01:00 and estimated end time of 02/23/2017 23:59:00 |
02/17/2017 | 02:10:02 PM | The combined output of Northport 3 and 4 is limited to approximately 500 MW. Estimated start Time of 02/21/2017 00:01:00 and estimated end time of 02/21/2017 23:59:00 |
02/16/2017 | 11:33:37 AM | The output of Northport Steam Unit #1 will be limited to approximately 289MW. Estimated start Time of 02/21/2017 00:01:00 and estimated end time of 02/22/2017 23:59:00 |
02/02/2017 | 10:13:16 AM | Glenwood GT 1 will be offline due to PSEGLI Transmission Related Work Estimated start Time of 02/06/2017 05:00:00 and estimated end time of 02/15/2017 14:59:00 |
01/05/2017 | 04:28:51 PM | Implementation Tables for G-R3 Table 4 which assumes BOTH West Bus DRSS and Wildwood DRSS ? In Service is effective immediately. Estimated start Time of 01/05/2017 16:23:00 and estimated end time of 12/31/2017 00:00:00 |