2021 Bulk Energy Storage RFP
PSEG Long Island, on behalf of the Long Island Power Authority, is issuing this 2021 Request for Proposals for Bulk Energy Storage (“RFP”) for bulk energy storage resources that will be interconnected to the Long Island electric grid. Questions and clarifications regarding the RFP may be submitted by sending an email to Ask2021BulkStorageRFPQuestions@sargentlundy.com. The questions and clarifications form included in Appendix J of the RFP must be completed included as an attachment to the email in PDF format.
- 2021 Bulk Energy Storage RFP Clarifying Questions and PSEG Long Island Responses: Updated July 26, 2021
SEQRA Documents
- Full Environmental Assessment Form - Part I Signed
- Full Environmental Assessment Form - Part I Supplemental Informational Attachment
- Attachment A - Project Description
- Attachment B - Land Use
- Attachment C - Natural Resources
- Attachment D - Visual
- Attachment E - Energy
- Attachment F - Noise
- Attachment G - Construction
- Attachment H - Traffic
- Attachment I - Community Facilities
- Attachment J - Human Health
- Figure A-1 Site Location Map
- Figure B-1 Existing Land Use
- Figure C-3 Tidal Wetlands
- Figure C-4 Coastal Area
- Figure C-5 Signification Natural Communities
- Figure C-6 300 Meter Buffer
- Figures D-1 through D-3
- Appendix A - Example Decommissioning
- Appendix B - NYSDEC Letter of Non-Jurisdiction
- Appendix C - Coastal Assessment Form
- Appendix D - Cross-Section Exhibit Visualization
- Appendix E - SHPO Letter
- Appendix F - Noise Evaluation Report
- Appendix G - West Bartlett EMF Study
- Appendix H - Typical Transmission Line EMF Fields
- Appendix I - Typical Transmission Line EMF Fields
- Appendix J - Fire and Safety Documentation
Mandatory Notice of Intent Submission: Updated July 27, 2021. Originally posted June 1, 2021
All Respondents are required to submit the Mandatory Notice of Intent (Appendix I) to 2021BulkStorageRFPNoticeofIntent@sargentlundy.com. The Mandatory Notice of Intent Submission window has been extended to July 28th, 2021. Please see the most recent RFP Addendum for updated information.
Presentation
- June 1, 2021 - 2021 Bulk Energy Storage RFP: Posted June 2, 2021
RFP Resources
- 2021 Request for Proposals for Bulk Energy Storage
ADDENDUM #1 - Clean Version | Redline Version: Issued May 11, 2021. Addendum #1 replaces the original posted on May 10, 2021.
ADDENDUM #2 - Clean Version | Redline Version: Issued July 27, 2021. Addendum #2 replaces Addendum #1 posted on May 11, 2021.
ADDENDUM #3 - Clean Version | Redline Version: Issued July 29, 2021. Addendum #3 replaces Addendum #2 posted on July, 27, 2021.
ADDENDUM #4 - Clean Version | Redline Version: Issued February 11, 2022. Addendum #4 replaces Addendum #3 posted on July 29, 2021.
- BOOT Contract - LIPA’s Preferred Bulk Energy Storage Build-Own-Operate-Transfer Contract: Posted May 10, 2021
ADDENDUM #2 - Clean Version | Redline Version: Issued May 11, 2021. Addendum #2 replaces the original posted on May 10, 2021.
ADDENDUM #3 - Clean Version | Redline Version: Issued June 23, 2021. Addendum #3 replaces Addendum #2 posted on May 11, 2021.
ADDENDUM #4 - Clean Version | Redline Version: Issued July 20, 2021. Addendum #4 replaces Addendum #3 posted on June 23, 2021.
- Bulk Energy Storage Locations Map
- BOT Term Sheet - Energy Storage Project Build, Own and Transfer Term Sheet: Posted May 10, 2021
- Energy Storage Project EPC Contract Term Sheet: Posted May 10, 2021
- Lease Agreement: Posted June 23, 2021
- Contingent Fee Certification
- Contractor Disclosure of Prior Non Responsibility Determinations
- MacBride Fair Employment Principles
- Non-Collusive Bidding Certification
- Cybersecurity Requirements
- Excel file for Appendix B – Data Form
ADDENDUM #1 - Clean Version | Redline Version: Posted: July 16, 2021
- Excel file for Appendix C – Energy Storage Pricing
- Interconnection Assistance
- NYS Vendor Responsibility Questionnaire/Certification:
Electronically via https://www.osc.state.ny.us/state-vendors/vendrep/vendrep-system or http://www.osc.state.ny.us/vendrep/ - M/WBE Utilization Plan
- Service-Disabled Veteran-Owned Business
- Diversity Questionnaire
- Workforce Employment Utilization
- Equal Employment Opportunity Policy Statement
- Sexual Harassment Policy
- Staffing Plan
- LIPA “Performance Requirements for Transmission-Connected Resources for Non-Synchronous Resources”
Information on Properties Owned by LIPA or to be Potentially Acquired by LIPA (Schedule F) and Site Access
- Outline: Posted May 18, 2021
- Non-Disclosure Agreement (NDA): Posted July, 16, 2021
- Site Inspection Request Form: Posted May 18, 2021
- Site Location Map - Barrett North: Posted May 18, 2021
- Site Location Map - Barrett South: Posted May 18, 2021
- Site Location Map - Far Rockaway Substation: Posted May 18, 2021
- Site Location Map - Glenwood South: Posted May 18, 2021
- Site Location Map - LIPA Property in close proximity to Shoreham substation: Posted May 18, 2021
- Site Location Map - LIPA Property adjacent to the Southold substation:
Please note: Due to development constraints, the LIPA property adjacent to the Southold substation has been removed from consideration in this RFP. Posted June 16, 2021
- Site Location Map - Port Jefferson: Posted May 19, 2021
Please note: Most of the blue lined marked up location includes the Stephen D. Matthews Preserve on which development is precluded. Please reference the map for all site development restrictions.
- Site Location Map - Shoreham: Posted May 18, 2021
- Site Location Map - West Babylon: Posted May 18, 2021
ADDENDUM #1 - Site Location Map – West Babylon: Posted July 20, 2021